Cancel or Change an Order
Last updated:
At a glance
Email [email protected] with the order number and the precise change you want. The default request window is 24 hours after the order is placed, provided it has not shipped. A request is not a confirmed change: wait for written confirmation. If payment has not been completed, first clarify whether an order exists or only a saved cart.
1. Request a change promptly
Email [email protected] with the order number and the precise change you want. The default request window is 24 hours after the order is placed, provided it has not shipped. A request is not a confirmed change: wait for written confirmation. If payment has not been completed, first clarify whether an order exists or only a saved cart.
2. Changing an item or size
Specify the original item, original size and desired replacement. The replacement must be available and any difference in price must be stated before it is accepted. Do not assume that an email silently updates the product variant in the store. Review the updated confirmation so the SKU, size, quantity and price agree with your request.
3. Correcting an address
Provide the complete corrected address, including the recipient name, street, unit, city, region, postal code and country. Avoid sending only one changed word or digit when that could create ambiguity. Address updates depend on the stage of fulfillment. After carrier handover, redirection may be unavailable and no change can be guaranteed.
4. Cancelling before dispatch
A cancellation must be confirmed before it is treated as complete. If the request can be accepted and the order was paid, an approved cancellation refund is issued to the original payment method within 7 calendar days after approval. If it cannot be stopped because it has already shipped, the returns process may apply instead. Do not assume that deleting a cart item cancels an existing order.
5. Keep one clear request
Send one complete message describing the action you want and follow up in the same conversation when possible. Multiple conflicting requests can delay a clear decision. If you change your mind about a cancellation, tell support promptly, but an already completed cancellation may require a new order. Keep the final written confirmation for your records.
Contact and related guidance
Contact [email protected] with a specific question. Read our contact guidance, returns process and refund policy for the relevant details.
Approved refunds are issued to the original payment method within 7 calendar days after approval. Payment-provider posting may take longer; this issuance commitment is not a guarantee that a bank or provider account will display the credit within the same period.
Make a clear order-change request
Check whether you are changing a cart or an order
A cart contains selections in your browser; an accepted order has its own order reference and record. Removing a cart line does not cancel an existing order, and an email about an order does not automatically edit your current cart. Identify which stage applies before choosing the next step. If checkout did not create an order, you may be dealing with a shopping-control question instead of a cancellation. If you are unsure, ask support with the checkout email, approximate date and any reference available rather than assuming that a paid order exists.
Make the requested action explicit
Begin your message by saying that you want to cancel, correct an address, change a selected option or ask about another available action. A message asking when an item will arrive is not necessarily a cancellation instruction. Name the order and state the outcome you want in plain terms. If more than one action is requested, separate them clearly and say which takes priority. This helps avoid an address question being reviewed while your actual intention was to stop the whole order. A clear request still needs an actual confirmation of what could be done.
Use the order reference rather than a product code
The order number identifies your purchase. A SKU identifies a catalog option and may appear on many purchases. Include the order number, checkout email and affected item so support can distinguish the request from a general question about a design. If you cannot find the order number, explain when you attempted checkout and what messages you received. Do not provide an account password, bank login or full card number to prove the purchase. A narrow set of relevant references is more useful and safer than a complete inbox or account statement.
Send the request promptly without assuming a cutoff
Contact support as soon as you notice the issue, because available actions depend on the actual order stage. This policy does not invent a universal cancellation cutoff or claim that every order can be changed for a fixed number of hours. A prompt message may be useful, but it does not by itself establish that the order stopped before dispatch. Wait for the specific reply explaining what was possible. If a deadline or event matters to you, say so as context rather than treating it as a promised service that has not been verified.
Describe a complete address correction
For an address change, clearly label the original destination and the corrected destination. Include the relevant recipient, unit or apartment, street, city, region, postal code and country details. An instruction that says only the address is wrong does not provide the replacement. Send these details through the support conversation rather than a public comment. The actual stage may limit what can be changed. A carrier tracking page and a shopping account page do not necessarily amend the destination on an existing order, so retain the confirmation of the action taken.
Changing the country can affect the available route
Eligible free-shipping destinations are the United States, Canada, Australia and New Zealand. If your requested correction changes the country, make that change especially clear and ask whether the order can be amended under the actual available arrangement. Do not assume another country is eligible because a postcode field accepts it or because you previously used a different address elsewhere. Free shipping concerns the charge; it does not establish a carrier or transit promise. Support should explain the applicable option for the actual order instead of an unverified route being invented.
Specify a size or color replacement
When asking to change an option, identify the original design, garment family, size and color and the exact replacement you want. A larger listed size may have another price, so a change should not be assumed to leave the order amount identical. Ask how any difference would be handled before relying on an amendment. A request does not reserve an option automatically or prove that it can be supplied. If fit caused the concern, seek the verified measurement that matters rather than make another selection based only on a generated styling image.
Changing the garment family is a distinct request
A T-shirt, crewneck sweatshirt and hoodie are different items rather than interchangeable size options. If you want another family, name the actual available product instead of saying to make the tee warmer. Artwork on one product page does not promise that every family offers the same design. Ask whether the requested change is possible at the actual order stage and how the listed price difference would be handled. Do not assume measurements match across families. The product and size pages can help you formulate the practical question before an amendment is confirmed.
Explain a quantity change line by line
If you want to reduce or increase an item quantity, state the original line and requested final quantity. Asking to remove one can be ambiguous when an order contains several designs or several units of one design. Make clear whether other order lines should remain. A change request should identify the final desired order rather than only a numerical difference with no product reference. Available action and any amount adjustment depend on the actual stage and confirmation. A quantity change in a browser cart does not establish that an accepted order was amended.
Distinguish partial cancellation from cancelling everything
For a partial cancellation, name each item and quantity to remove and identify the items you want to keep. For a full cancellation, say that you want the whole order cancelled. This distinction matters for the order record and any approved amount adjustment. Do not assume that a question about one item means support should stop all other items. Keep the reply that confirms the actual scope. If your preference changes while the conversation is open, state the updated outcome clearly before relying on an earlier instruction.
Review a suspected duplicate order before repeating checkout
If you believe you placed the same purchase twice, identify both order references where available and explain which one you want reviewed. Distinguish a repeated email notification from two actual order records, and a pending payment entry from a completed payment if the provider shows those statuses. Do not repeat checkout again to test the situation. Contact support about the existing records first. A duplicate-order concern and a request to change an item are different tasks, so name the one you need resolved and provide the matching reference.
A sent message is not completed cancellation
A support message records your request; a specific confirmation describes what was done. Read whether the reply acknowledges the message, asks for another fact or confirms cancellation. Those are different stages. Keep the confirmation with your order records rather than infer the outcome from silence, a changed cart or a temporary page error. If you cannot understand the reply, ask which action has been completed. This policy does not promise an unsupported response time or invent a server action merely because an enquiry was sent.
Dispatch can change the appropriate next step
Once an item has actually dispatched, stopping or altering the order may involve different limits from an earlier amendment. If the requested change cannot be made, ask what options remain for the actual situation. Do not assume that a tracking event proves the order is cancellable or that a support email can reroute every parcel. An eligible return after delivery is a separate process with its own instructions and 60-day request window. Explain whether you want help with the travelling parcel or guidance about a later return so the next step is appropriate.
Use actual carrier options carefully
If a legitimate carrier offers a delivery-management tool for your parcel, read what that service actually permits and verify that the reference matches your shipment. A delivery preference is not necessarily a store order amendment. Do not provide account credentials through an unfamiliar message claiming to arrange a redelivery. If the option is unclear, contact support with the actual notice and reference. We do not publish a fictional rerouting service or guarantee that every carrier accepts address changes. Keep carrier instructions distinct from the store’s confirmation of any order action.
Keep a refund confirmation separate
An eligible cancellation may lead to an approved refund, but the cancellation request alone does not prove that money was issued. Approved refunds are issued to the original payment method within 7 calendar days after approval. Payment-provider posting may take longer; the issuance commitment is not a guarantee that a bank account will display the credit within the same period. Keep the approval message and relevant transaction reference. Use the refund page if the question concerns an amount or payment status rather than whether an item was stopped.
Do not use support email as an alternative payment route
Payment setup is deferred until a real gateway has been connected and verified. If checkout has no available payment method, sending card information to support is not an appropriate substitute. A catalog selection or an intended future gateway does not establish a paid order. Ask about actual payment availability before assuming a cancellation or refund is needed. Your message should not contain a card security code, password or one-time authentication code. A support enquiry can discuss the order facts without collecting credentials unrelated to the requested action.
Correct the facts in an ongoing conversation
If you sent the wrong replacement size, omitted a unit number or changed your preferred outcome, add the corrected detail clearly in the same conversation where possible. Identify which earlier instruction it replaces and keep the order reference attached. Avoid several conflicting messages with no clear final request. An update still needs confirmation about what can be changed at the actual stage. This approach keeps the request understandable without assuming the latest email automatically overwrote an order record before it was reviewed.
Ask about the next unresolved step
When an action remains unclear, ask the precise question you need answered: whether the order was cancelled, which address is confirmed, what selection remains or whether a refund was approved. Include the relevant previous reply and date without forwarding unrelated private material. The contact, tracking, returns and refund pages provide related guidance, but reading them does not create an amendment or authorize a parcel destination. Keep actual confirmations and seek clarification where a practical step has not yet been established.
Read Contact, Tracking, Returns, Refunds and Payment availability.